At KC Airport’s Marriott, It’s IntelliStation® to the Rescue
Share this Case Study
Industry
Hospitality
Category
Product(s) Installed:
Customer
Kansas City Airport Marriott
Location
Kansas City, MO
Scope
384-room hotel with steady occupancy at all hours battled domestic hot water issues due to a large hydronic valve with a sluggish 120-second response time that couldn’t actuate quickly to keep up with the hotel's changing water pressures.
What Client Needed
A dependable system that could deliver properly mixed water throughout a hot water recirculation loop during high-demand periods.
Solution
IntelliStation® Digital Mixing System
Result (ROI)
Four months into installing new system, guests are happier due to sufficient hot water, even during peak shower hours.
Ian WaltersLexington Plumbing“The Powers IntelliStation® was built for challenges exactly like this one. We had specified the system at several different facilities and it exceeded facility manager expectations every time.”